HAINZL took over the comprehensive cylinder revamping at the Ottensheim/Wilhering hydropower plant. After around 25 years of operation, the cylinders of the lower weir gate, which enable the lock gates to be opened and closed, were defective. The 10-metre-long and nine-tonne cylinders were dismantled using a floating crane. In order to restore the locks for shipping traffic on the Danube as quickly as possible, a tight schedule was necessary. The removable displacement transducer makes it easier to carry out servicing in the installed state.