As part of the comprehensive revitalization of the Ottensheim/Wilhering hydropower plant, HAINZL was entrusted with the renewal of the hydraulics. The challenges lay in the actual status survey of the installed third-party products, the tight schedule and the complex installation situation. The agreed commissioning date had to be adhered to at all costs, as the weather conditions were relevant for the installation (flooding).
Scope of the project